Close Menu
StreamLineCrypto.comStreamLineCrypto.com
  • Home
  • Crypto News
  • Bitcoin
  • Altcoins
  • NFT
  • Defi
  • Blockchain
  • Metaverse
  • Regulations
  • Trading
What's Hot

Hashgraph Group Launches Hedera Tool for EU Digital Product Passports

February 24, 2026

Brazil cuts Bitcoin miner import duty to zero and companies may plug them into stranded solar next

February 24, 2026

Ethereum Foundation begins staking 70,000 ETH from treasury

February 24, 2026
Facebook X (Twitter) Instagram
Tuesday, February 24 2026
  • Contact Us
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
StreamLineCrypto.comStreamLineCrypto.com
  • Home
  • Crypto News
  • Bitcoin
  • Altcoins
  • NFT
  • Defi
  • Blockchain
  • Metaverse
  • Regulations
  • Trading
StreamLineCrypto.comStreamLineCrypto.com

Hut 8 Posts $134M Q1 Loss Amid Strategic Shift Toward Energy Infrastructure And Bitcoin Mining

May 9, 2025Updated:May 10, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Hut 8 Posts 4M Q1 Loss Amid Strategic Shift Toward Energy Infrastructure And Bitcoin Mining
Share
Facebook Twitter LinkedIn Pinterest Email
ad


Hut 8 Corp. (Nasdaq | TSX: HUT) reported a Q1 2025 internet lack of $134.3 million, marking a turbulent begin to the 12 months as the corporate executes a daring technique to develop into a totally built-in power infrastructure platform. Quarterly income got here in at $21.8 million, down from $51.7 million year-over-year, whereas Adjusted EBITDA was reported at ($117.7) million.

In the present day we introduced our outcomes for Q1 2025, a interval of deliberate funding designed to unlock the potential of our improvement flywheel.

Highlights

– Deployed our upgraded ASIC fleet to finish the quarter with 9.3 EH/s at roughly 20 J/TH

– Launched @AmericanBTC to… pic.twitter.com/JoEbWIuMhd

— Hut 8 (@Hut8Corp) May 8, 2025